Sign In | Join Free | My himfr.com
Home > Pipe Tee Fittings >

Low Alloy A234 WP91 Pipe Tee Fittings , T Connector Plumbing ASME B16.9

HEBEI PENGXIN PIPELINE EQUIPMENT GROUP CO.,LTD
Contact Now
    Buy cheap Low Alloy A234 WP91 Pipe Tee Fittings , T Connector Plumbing ASME B16.9 from wholesalers
     
    Buy cheap Low Alloy A234 WP91 Pipe Tee Fittings , T Connector Plumbing ASME B16.9 from wholesalers
    • Buy cheap Low Alloy A234 WP91 Pipe Tee Fittings , T Connector Plumbing ASME B16.9 from wholesalers
    • Buy cheap Low Alloy A234 WP91 Pipe Tee Fittings , T Connector Plumbing ASME B16.9 from wholesalers

    Low Alloy A234 WP91 Pipe Tee Fittings , T Connector Plumbing ASME B16.9

    Ask Lasest Price
    Brand Name : PengXin
    Model Number : A234 WP91
    Certification : ASME
    Price : consult
    Payment Terms : T/T
    Supply Ability : 100000Tons per year
    Delivery Time : 2-10weeks
    • Product Details
    • Company Profile

    Low Alloy A234 WP91 Pipe Tee Fittings , T Connector Plumbing ASME B16.9

    Processing technology and equipment of seamless and slotted hot extrusion tee


    Main processing technology

    Raw materials entering the factory

    Cut to blank

    Flatten to size requirement

    Heating convex opening

    Hot extrusion

    Heat treatment

    Machining groove

    Surface treatment

    Finished product inspection

    Logo protection

    Warehousing and storage

    (Note: there is a pickling and passivation process for stainless steel tee joint groove after processing)

    Material rangeCarbon steel, chromium molybdenum steel, low alloy and all kinds of stainless steel
    Product specificationsDn100-dn2000 seamless and slit hot extrusion tee, boiler and high pressure tee pipe fittings (same and reducing diameter)
    Main equipment and tooling

    1. One 5000t hydraulic press (mainly used for flattening and hot pressing)

    2. One 500t hydraulic press (mainly used for flattening and hot pressing)

    3. One 315T hydraulic press (mainly used for flattening and hot pressing)

    4. Two gas heating furnaces: effective heating area 7.5 square meters and 2.3 square meters

    5. One gas heating furnace: the effective heating area is 6.4 square meters

    6,One pipe blanking machine (self-made)

    7,Machining equipment:

    • Two lathes (620-1)
    • One vertical lathe: one C5225
    • Two ordinary lathes C630
    • One vertical drilling machine
    • One boring machine T6112

    8.Heat treatment equipment:

    • One trolley type fuel oil heat treatment furnace, with effective heating area of 8 square meters
    • One trolley type box type resistance furnace RT9-80 × 1500 × 60, with maximum furnace temperature of 1200 ℃

    9,Two sandblasting machines:It is mainly used for pipe surface rust removal

    10,Air compressor:For air cooling of heat treatment

    11,Liquid cooling pool:

    • For pipe cooling (processing and heat treatment)
    • Solution treatment of stainless steel

    12,Machining fixture: 40 sets

    13,Welding equipment: 14 sets (for auxiliary processing)

    14,120 sets of various molding molds (for extrusion molding guarantee)

    15,One stainless steel pickling tank

    Low Alloy A234 WP91 Pipe Tee Fittings , T Connector Plumbing ASME B16.9

    Quality Low Alloy A234 WP91 Pipe Tee Fittings , T Connector Plumbing ASME B16.9 for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: HEBEI PENGXIN PIPELINE EQUIPMENT GROUP CO.,LTD
    *Subject:
    *Message:
    Characters Remaining: (0/3000)